The Practical Path to Net Zero

Optimize Today.
Transition Tomorrow.

Moving to renewable energy is a journey, not a switch. I help businesses optimize their current systems now to fund the gradual shift to a sustainable future.

City & Guilds (2023-24) Phased Approach Commercial

Your Energy Roadmap

Phased implementation plan

1

Immediate Optimization

Tune current boilers & controls to cut OpEx by 15%.

2

Infrastructure Prep

Upgrade piping & insulation to be "Heat Pump Ready".

3

Renewable Integration

Install Hybrid or Full Renewable systems via phased integration.

Philosophy

"Don't rip and replace. Optimize, prepare, then upgrade."

Commercial Plant Room Engineering

The Bridge to Renewables

Engineering the transition

About Kimberley Elliott

Bridging the Gap Between Gas and Green Energy

I'm Kimberley Elliott, and I know that while many businesses want to go green, the leap is expensive and complex. My philosophy is simple: transition through engineered phases.

With my recent City & Guilds certification (2023-2024), I understand modern efficiency standards deeply. I use my background as a Gas Engineer not just to maintain what you have, but to prepare it for what comes next.

We start by making your current plant room hyper-efficient to free up budget. Then, we upgrade your pipework and radiators to handle lower flow temperatures. Finally, when the time is right, your building is technically ready for heat pumps or hybrid systems.

Strategic Roadmap Creation
"Renewable Ready" Checks
Hybrid System Advice
OpEx Reduction Focus

The Transition Services

A Phased Approach to Sustainability

STEP 1

Optimize Existing Tech

Before buying new tech, let's fix the old. I optimize your current gas boilers and controls to stop energy waste immediately, often funding future upgrades.

  • Boiler Sequencing
  • Control Strategy Audit
STEP 2

Renewable Readiness

Is your building actually ready for a heat pump? I audit your pipe sizes, radiator output, and insulation to ensure your future renewable system will actually work.

  • Pipework Validation
  • Heat Loss Reduction
STEP 3

Transition Planning

Designing the switch. Whether it's a Hybrid system (Gas + Heat Pump) or full Hydrogen-ready tech, I map out the installation phases to minimize disruption.

  • Hybrid Integration
  • Future-Proofing Spec

The Cost of Inefficiency

Optimizing your current system can fund your future renewable projects.

18°C 22°C 25°C
Annual Savings Potential
£0

See how preparing for renewables saves you money today.

Helping businesses prepare for the future

"We wanted heat pumps but our pipes weren't ready. She created a 2-year plan to upgrade our infrastructure so we can switch seamlessly later."

- Logistics Manager, Watford

"Her technical knowledge is refreshing. She optimized our gas boilers today which saved us enough to start insulating the roof next month."

- Office Manager, Southwark

"A clear, structured roadmap. No pushy sales for expensive tech we aren't ready for yet. Just solid engineering advice."

- Retail Owner, Wembley

Start your transition today

Book a roadmap consultation to see where to begin.

Or email directly: hello@phasechange.co.uk